Two story new construction duplex located in upcountry Maui, in this multi stage solar project the asphalt shingle composite roof is now ready for installation and has been lined with the underlayment material.
Now with the roof completed the project is ready for the Iron ridge mounting and racking hardware to be installed.
Here we see a aerial shot of the mounting and racking hardware completed and ready for the modules to be installed.
Here we can see the installers on the roof laying out the modules on the racking getting ready to secure them.
The REC 356 watt modules are almost all secured to the racking at this phase of the project and the roof installation is almost completed.
All of the modules are set and secured at this phase of the multi stage solar project, the installation on the duplex roof is now completed, now they are ready for the installation of the Tesla Powerwalls and the electrical portion of the project.
Being that this is a new construction project the customer has the option of hiding the conduit in the walls making for a cleaner looking installation showing no conduit connecting to the Tesla Powerwall’s. Here we see the conduit hidden in the wall ready to be covered up with the sheeting material.